PE Pipe Winter Use Precautions(一)

The precautions for the use of PE pipes in winter are as follows:

First, pipe handling:

Strictly regulate the handling, transportation, loading and unloading of products, and there shall be no throwing, falling, rolling or dragging to prevent damage to the products. In particular, it must be handled lightly during the unloading process. After transporting to the construction site, it should be properly kept to prevent the pipe from rubbing against sharp objects. Personnel must not step on the pipe, the above behavior will cause cracks and internal injuries in the inner wall of the pipe, and multiple bursts will occur when the pressure is applied.

Second, pipe trench mining:

1. Pipe trench excavation should consider the depth of local frozen soil. The pipeline must be buried below the frozen soil layer. The buried depth of the pipeline is generally below 1.2~1.5 meters. The width of the trench trench should be determined according to the outer diameter of the pipe and the width of the bottom of the trench. It is advisable to add 300 mm to the outer diameter; it is not allowed to trample the pipe during construction.

2, the bottom of the ditch should be leveled, no stones, bricks and other debris, if there is hard material, you must add 10cm and fill the sand and then install the pipeline.

Third, the pipe laying:

Check whether the pipe is damaged before the lower pipe, and do not throw the pipe and pieces into the ditch.